Form Center

By signing in or creating an account, some fields will auto-populate with your information and your submitted forms will be saved and accessible to you.

Assembly Permit Application

  1. Application Type

  2. The following documents must be submitted with this permit application or on file with the Bureau of Fire Prevention before a permit is issued.

  3. New Permits

    Seating Arrangements (FPE Review)
    Square Footage (FPE Review)
    Exit Location Plans (FPE Review)
    Fire Alarm and Sprinkler system annual inspection reports
    Hood Suppression system semi-annual inspection reports

  4. Renewals

    Fire Alarm and Sprinkler system annual inspection reports
    Hood Suppression system semi-annual inspection reports
    Hood inspection/cleaning semi-annual inspection report

  5. The Bureau of Fire Prevention also needs plans and specifications for any proposed changes before inspection to ensure compliance with applicable codes and standards. Dependent on the scope of work, certain changes may require the review of a Fire Protection Engineer (FPE) before submittal to the Bureau of Fire Prevention. Reviews by NH registered professional engineers with a specialty in Fire Protection only are acceptable. See the State of NH Joint Board of Licensure and Certification. Inspection requests require a 48- hour minimum notice by the applicant

  6. Mail All Documentation to:

    Hampton Fire / Rescue
    Bureau of Fire Prevention
    140 Winnacunnet Road
    Hampton NH 03842

  7. Leave This Blank:

  8. This field is not part of the form submission.